Powercom-Group Facility Management

Engineering Site Survey

Based on our experiences of facility management process with efficiency, flexibility, low-cost; we’ve  also shared images of ideas in order to scale survey for IT room or Data Center as well. The reality, to set our goals such as making images, satisfactions and transparency to our client; Powercom Group could provide first correct-safety site survey at IT room before starting build of material process.

Architecture Drawing 2D & 3D

The implementation of the blueprint for the IT room or Data Center project is the second phase after the site selection. Architectural style drawing in 2D & 3D is also a specialty of our team of engineers who dedicated the best to delivering the best products to our clients. Our architecture staffs provide clients or our business partners the floor plan developed for all kind of M&E projects in beautiful blueprint. 

Build Of Materials

A bill of material is a list of raw materials, parts, components, and the quantity as required to purchase and/or supply to a main project. The products or equipment list can be specified to build to clients and are usually used in purchase order procedures for project supports. They describe the product and the materials needed when they are designed, ordered, or built.

Planning and site selection for server room is one of the most difficult. For IT room or Data Center facility should employ with Electrical, Mechanical, Fire Protection and Suppression, Security System, Communication and Control System. All the facilities must be applied with system controls into one control room combined; and each of their capacity is either fitful or compatible running out for all of electrical low voltage devices. What is the most important that designed activities of our engineering experts have reserved various designated points in right position of multi-function operation systems.

Why do we need first to site selection for IT room or Data Center?

Because IT room or Data Center is very important and most security place to business operation organizations. Planning and design should contemplate the business growth strategies of the company as distant as they can eventually be envisaged or anticipated on data storage horizon.

What should we know about the volume of the future data storage?

As well as predicating technology expert’s conclusion, they can make decision on technology innovation challenging increasingly, accessing target audience, business streaming flows and public communications but at all depend on available budget leads first.

Relating to acknowledge of understanding the standard equipment, the technical solutions have been organized to IT room or Server room, after the site selection has been completed and the facility management activity start first is the raised access flooring activity.

Why do we need the raised access flooring?

Because of the beauty is the most important to satisfying the humanity concept. There are two types of raised access flooring; Raised Access Flooring and Building Constructed Raised Access Flooring.

Raised Access Flooring heights: from 2 inches to heights about 4 feet (1.2 m).

Purpose: Service support for Electrical, Optical, Telecommunication, Heating/Ventilation and Mechanical can be routed.

Components of Raised Flooring: (A) Floor Panels, (B) Pedestals

Organizing an electrical and power system to supply the critical electrical equipment is very important as like a doctor who has the experience and talent in operating to give a real breath or life to a person who is dying. Powercom Group has basic acknowledgements to solve this problem, and we never let this problem happens with our clients before. We can say that we are an experienced doctor to give life of power system to our clients. We could manage and supply all kind of power systems at Grid-Off, Grid-In and Power Backup Support 24/7 with all of power system equipment supports such as generator, UPS, Solar System and Rectifier.

Designing a cable network is a complex task, where our engineers pay close attention to technical standards, the advantages of operating systems, and the longevity of all kind of cables. We have a comprehensive set of resources and supplies, including network engineering technicians, a labor team, labor resources, procurement, and supply chain services. Most important for the cabling and network management project is to design a kind of fiber optic cable, which requires both high-standard technical work and technical equipment. All the activities of cabling and network management are organized to all of control system units such as Main Distribution Board (MDB) for electrical cable installed links, Network Switches & Networking Devices installed in allocated networking device places and to the control room etc.   

Because of these assets and property care, we get asked often about safety strategy management, “Can my business manage its own workplace fire safety program?” Our answer is always Yes and No. To get responsibility for what fire safety we can manage and what shall be managed by a licensed fire protection company. Most preventively, we already know that Occupation Safety Health and Administration (OSHA); fire safety regulations require employers to be aware of safety improved plans. Put simply, the OSHA fire prevention and safety plan is compiled specifically for your company. It must be a learning service and be aware of the fire protection devices and materials.

LEARNING SERVICE:

  • Explain how everyone can prevent fires.
  • Detail what to do if there is a fire.
  • Include all emergency procedures.
  • Designate fire watch/fire safety personnel.
  • Define fire escape routes.

BE AWARE OF DEVICES AND MATERIAL:
   Fire Sprinkler Systems             Backflow Systems
  Water Systems                         Fire Extinguishers
   Fire Suppression Systems      Fire Alarm Systems
   Live Safety Systems                 Fire Door Exit
   Emergency Lighting Systems Special Hazards